Kitchen renovations: first stage

The kitchen has had its fair amount of attention over the past few weeks… a damp wall needed to be re-plastered as well as areas where I had removed old kitchen tiles and of course left huge holes.

IMG_6668photo 4photo 2-1photo 3-1photo 2IMG_6727photo 1-1IMG_6725

The plaster has since dried out and I’ve applied two coats of white paint which has freshened up the room. I’ve chosen a copper pendant to hang over the central island and add warmth to the room. There’s still woodwork to finish and the worktops/cabinet doors to change but we’re making progress! The new larder freezer arrived today too so there will be plenty of room to store home-made goodies. SCH

photo 1IMG_6724IMG_6726IMG_6728

 

 

 

Renovations part two: downstairs guest bathroom

Changes to the downstairs bathroom are well underway! We’ve removed the old wall cupboards and washing machine unit, knocked through the wall under the stairs and begun the (long, arduous) task of removing two layers of wall tiles and all the floor tiles.

There has been one small change to the design plan; the toilet is going to move to the side of the old under-stairs door to allow for a streamlined look to the built in units under the window. I have also decided that one sink will not be enough – we need two!

IMG_6333IMG_6340IMG_6334IMG_6336 

Here is the revised rough sketch of how the downstairs guest bathroom will look when finished:

IMG_6344

Colour wise I’m trying to stay away from neutrals… but that’s always tricky to do! SCH