Renovations part two: downstairs guest bathroom

Changes to the downstairs bathroom are well underway! We’ve removed the old wall cupboards and washing machine unit, knocked through the wall under the stairs and begun the (long, arduous) task of removing two layers of wall tiles and all the floor tiles.

There has been one small change to the design plan; the toilet is going to move to the side of the old under-stairs door to allow for a streamlined look to the built in units under the window. I have also decided that one sink will not be enough – we need two!

IMG_6333IMG_6340IMG_6334IMG_6336Β 

Here is the revisedΒ rough sketch of howΒ the downstairs guest bathroomΒ will look when finished:

IMG_6344

Colour wise I’m trying to stay away from neutrals… but that’s always tricky to do!Β SCH

4 thoughts on “Renovations part two: downstairs guest bathroom

Leave a reply to Crafty Getaways Cancel reply